[ARCHIVED] SSO Statement 283 Ashbury Circle

On June 1, 2022 at 7:00 p.m. Paulding County Dispatch received a call that a manhole was overflowing behind 283 Ashbury Circle. Crews were dispatched and arrived on site by 7:30 p.m. A manhole was overflowing at a rate of approximately 40 gallons per minute. A jetting machine was used to break through a clog in the pipe between the first manhole and the Oakley Point lift station. The overflow stopped at 9:00 p.m. A total estimated flow of 4800 gallons of untreated sewage discharged into a tributary of Picketts Mill Creek. Signs have been placed at the creek and lime was added to the site.